Building Material Stores Ytong CLC Block Autoclaved Aerated Concrete Block Plant AAC Panel Production Line Manufacturing AAC Gas Block Plant Supplier

1 Plant
MOQ
$300,000.00(>=1 plants)
Price
Building Material Stores Ytong CLC Block Autoclaved Aerated Concrete Block Plant AAC Panel Production Line Manufacturing AAC Gas Block Plant Supplier
Features Gallery Product Description Request A Quote
Features
Specifications
Applicable Industries: Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Construction Works 
Showroom Location: Kazakhstan, Uzbekistan
Condition: New
Type: Autoclaved Aerated Concrete Block (AAC)
Brick Raw Material: Other
Processing: Brick Production Line
Method: Autoclaved Aerated Concrete, Mixing+Pouring+Precuring+Cutting+Autoclaving+Separating+Packing
Automatic: Yes
Production Capacity (Pieces/8 Hours): 50,000m3/year
Voltage: As Per Local Condition
Dimension(L*W*H): 6050*1540*650mm
Warranty: 1 Year
Key Selling Points: Remote Monitoring
Brick Size: Other
Machinery Test Report: Provided
Video Outgoing-inspection: Provided
Marketing Type: New Product 2020
Warranty Of Core Components: 1 Year
Core Components: PLC, Motor, Bearing
Weight (KG): 30000 Kg
After-sales Service Provided: Field Maintenance And Repair Service
Advantage: Germany Technology
Installation: Engineer Guidance
Molding Cycle: 15-20s
Product Keywords: Aac Block Machine And Price
Certification: GB/T 19001-2008/ISO 9001:2008
Basic Infomation
Certification: GB/T 19001-2008/ISO 9001:2008
Payment & Shipping Terms
Packaging Details: Parts by container, other parts by bulk.
Supply Ability: 1 Plant/Plants per Month
Product Description
INTRODUCTION

Aerated concrete brick is a light and porous building material. It is based on cement, lime, slag, fly ash, and sand and made of materials such as gas as raw material.
It has the features of being light; keeping temperature can’t be burn, good insulation and others.
It can be made into many kinds of sizes e.g. 600×200×100, 600×200×125…
They could be used in industry building and common building. As one of the earliest and most widely used materials, they are more
and more popular in the world and they will replace the Clay brick completely.
PRODUCT DESCRIPTION
Thew raw materials pictures are above.

WORKING PRINCIPLE
Material dealing section 
Put the fly ash or sand into the ball mill to mill via the conveyor belt, after milling, put the slurry into the slurry storage
tank by slurry pump.

Batching, mixing and pouring process
The lime, cement will convey by conveyor to the dry powder measure scale to scale separately. The slurry convey by slurry pump
then to the automatic scale;the power and slurry put into the mixer,pouring into the mould.

Curing process
After slurry pouring into the mould, put the mould box into the curing room with 50~70℃. After 2-3 hours curing,the blocks become solid
Cutting process.
Using tilting crane carry the mould and block to demould on cutting cart. The cutting cart will take the block to level cutting
machine, vertical cutting , two sides cutting, and remove the top waste material.
Autoclaving 
Finished cutting using grouping crane carry to the front of autoclave grouped,
hoisting machine or dragger will drag steam trolley into autoclave to steam, it needs 8-10 hours
Packing 
Using finished block carry hanger clamp the finished product to package line on wooden pallets, after package, then by forklift
transport the finished products to piled yard according to specifications to stack.
COMPANY PROFILE
Recommended Products
Get in touch with us
Contact Person : Maple
Characters Remaining(20/3000)